Why 6 weeks is realistic
Most clients think 6 weeks isn't enough time. In reality, the problem isn't the timeframe, but the workflow. If you spend the first week approving a concept instead of booking a venue, things will only get worse from there. We’ve pulled off several forums in that timeframe. Each time, the key was the same: running all processes in parallel from day one. Not sequentially, but simultaneously.
What you can't put off
The first two weeks determine everything. If you haven't booked a venue by the end of the second week, you’re already in trouble. Here are the priorities:
- Venue: sign a contract, don't just "agree" on it
- Team: define who is responsible for what — and document it
- Client communication: agree on the program and areas of responsibility
Logistics is not a minor detail
This is where most teams start "firefighting." We try to prevent that by using a strict system of deadlines for every contractor. For an international forum, it’s critical: flights and transfers for foreign delegates must be confirmed no later than 3 weeks before the event. Any delay, and you’ll be missing a delegate for a key session.
Rehearsals are not a formality
A technical run-through is mandatory. Not "if we have time," but mandatory. We build it into the plan from day one. For a hybrid forum, we include a separate stream test with a backup channel. If the online portion freezes in the first 5 minutes, the impression of the event is ruined, regardless of how well everything else goes.
30 points that save any forum
Week 1–2
- Signed venue contract
- Approved event program
- Defined team and areas of responsibility
- Tenders launched for contractors (AV, catering, translation)
- Attendee registration open
Weeks 3–4
- All contractors confirmed — contracts signed
- Logistics for international delegates finalized
- Branded materials in production
- Event schedule approved by client
- Contingency plans for technical risks
Week 5 and event day
- Technical run-through completed
- Broadcast test with backup channel
- Briefing for moderators and hosts
- Emergency contact list provided to every team member
- On-site team — everyone in position 3 hours before start time
Conclusion
6 weeks is enough time if you have the right team and the right process. If not, even 6 months might not be enough. If you have a forum or conference to organize and don't know where to start, just drop us a line. The first consultation is free.
Heading 1
Heading 2
Heading 3
Heading 4
Heading 5
Heading 6
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.
Block quote
Ordered list
- Item 1
- Item 2
- Item 3
Unordered list
- Item A
- Item B
- Item C
Bold text
Emphasis
Superscript
Subscript